Final report : Dallas Integrated Corridor Management (ICM) Demonstration Project.
-
2015-08-01
-
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The Dallas Area Rapid Transit (DART) is leading the US-75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information on highways, arterials, transit, weather, and incidents. The ICM system utilizes the existing Texas Department of Transportation (TxDOT) Center-to-Center standards based communication infrastructure, and provides direct connections to agencies not on the Center-to-Center network via a web-based interface known as SmartNET. The ICM system uses SmartNET as the main graphical user interface for the ICM stakeholders to create, edit, and view events in the corridor and region, view current conditions of field devices and congestion on the roadway network, and coordinate responses to incidents within the corridor. This final report covers the project’s process and results for the various phases of the ICM program, lessons learned, and recommendations for others implementing ICM.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: