Test report : Dallas Integrated Corridor Management (ICM) demonstration project.
-
2015-05-01
-
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM)
Demonstration Project for the Dallas region. Coordinated corridor operations and management is
predicated on being able to share transportation information on highways, arterials, transit, weather, and
incidents. The ICM system will utilize the existing TxDOT Center-to-Center standards based communication
infrastructure, and will provide direct connections to agencies not on the Center-to-Center network, via a
web-based interface known as SmartNET. The ICM system uses SmartNET as the main graphical user
interfaces for the ICM Stakeholders to create, edit, and view events in the corridor and region, view current
conditions of field devices and congestion on the roadway network, and coordinate responses to incidents
within the corridor.
This Test Report covers the test process and results for the various phases of testing for the ICM system.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: