United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office (2010). US-75 ICM system requirements : Dallas Integrated Corridor Management (ICM) demonstration project (Report No. FHWA-JPO-11-047). United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office. https://rosap.ntl.bts.gov/view/dot/3473
United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office. US-75 ICM system requirements : Dallas Integrated Corridor Management (ICM) demonstration project. Report no. FHWA-JPO-11-047. United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office, 2010. https://rosap.ntl.bts.gov/view/dot/3473.
United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office US-75 ICM system requirements : Dallas Integrated Corridor Management (ICM) demonstration project. United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office, 2010, Report no. FHWA-JPO-11-047, ROSA P. https://rosap.ntl.bts.gov/view/dot/3473.
This document is intended as a listing and discussion of the Requirements for the US-75 Integrated Corridor Management System (ICMS)
;
Demonstration Project in Dallas. This document describes what the system is to do (the functional requirements), how well it is to perform (the
;
performance requirements), and under what conditions (non-functional and performance requirements). This document does not define how the
;
system is to be built; that is the providence of the design document. This document pulls together requirements from a number of sources including but
;
not limited to the Concept of Operations, the initial Systems Requirements Document and constraints identified by the agencies. This document sets
;
the technical scope of the system to be built for the Demonstration Project. It is the basis for verifying the system and sub-systems when delivered via
;
the Verification Plan
United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office (2010). US-75 ICM system requirements : Dallas Integrated Corridor Management (ICM) demonstration project (Report No. FHWA-JPO-11-047). United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office. https://rosap.ntl.bts.gov/view/dot/3473
United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office. US-75 ICM system requirements : Dallas Integrated Corridor Management (ICM) demonstration project. Report no. FHWA-JPO-11-047. United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office, 2010. https://rosap.ntl.bts.gov/view/dot/3473.
United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office US-75 ICM system requirements : Dallas Integrated Corridor Management (ICM) demonstration project. United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office, 2010, Report no. FHWA-JPO-11-047, ROSA P. https://rosap.ntl.bts.gov/view/dot/3473.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.