US-75 ICM system requirements : Dallas Integrated Corridor Management (ICM) demonstration project.
-
2010-12-01
Details:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This document is intended as a listing and discussion of the Requirements for the US-75 Integrated Corridor Management System (ICMS)
Demonstration Project in Dallas. This document describes what the system is to do (the functional requirements), how well it is to perform (the
performance requirements), and under what conditions (non-functional and performance requirements). This document does not define how the
system is to be built; that is the providence of the design document. This document pulls together requirements from a number of sources including but
not limited to the Concept of Operations, the initial Systems Requirements Document and constraints identified by the agencies. This document sets
the technical scope of the system to be built for the Demonstration Project. It is the basis for verifying the system and sub-systems when delivered via
the Verification Plan
-