Connected Vehicle Pilot Deployment Program phase 1 : deployment readiness summary : ICF/Wyoming : final report.
-
2016-09-13
-
Details:
-
Alternative Title:Connected Vehicle Pilot Deployment Program phase 1 : deployment readiness summary : ICF/Wyoming.
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
TRIS Online Accession Number:1632331
-
Corporate Publisher:
-
Abstract:The Wyoming Department of Transportation’s (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to reduce the impact of adverse weather on truck travel in the I-80 corridor. These applications support a flexible range of services from advisories, roadside alerts, parking notifications and dynamic travel guidance. Information from these applications are made available directly to the equipped fleets or through data connections to fleet management centers (who will then communicate it to their trucks using their own systems). The pilot will be conducted in three Phases. Phase 1 includes the planning for the CV pilot including the concept of operations development. Phase 2 is the design, development, and testing phase. Phase 3 includes a real-world demonstration of the applications developed as part of this pilot.
This document presents the Deployment Readiness Summary, which: i) provides a status of all Phase 1 deliverables and a specific punch list of ongoing activities to complete the outstanding deliverables; ii) establishes that the Wyoming CV Pilot team have met all the required elements in the CV Program Phase 1 Broad Area Announcement (BAA); and iii) describes the Wyoming CV Pilot team’s level of readiness to immediately initiate Phase 2 activities. The work accomplished in Phase 1 lays an important foundation from which to perform Phase 2 and 3 activities to design, build, test, and demonstrate the CV technologies.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: