Connected Vehicle Pilot Deployment Concept Phase 1, Comprehensive Deployment Plan, ICF Wyoming
-
2018-05-11
-
Details:
-
Alternative Title:Wyoming DOT Connected Vehicle Pilot Demonstration-Comprehensive Pilot Deployment Plan
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
TRIS Online Accession Number:1632339
-
Edition:Phase 2 Update v3 05/11/2018
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:The Wyoming Department of Transportation’s (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to reduce the impact of adverse weather on truck travel in the I-80 corridor. These applications support a flexible range of services from advisories, roadside alerts, parking notifications and dynamic travel guidance. Information from these applications are made available directly to the equipped fleets or through data connections to fleet management centers (who will then communicate it to their trucks using their own systems). The pilot will be conducted in three Phases. Phase 1 includes the planning for the CV pilot including the concept of operations development. Phase 2 is the design, development, and testing phase. Phase 3 includes a real-world demonstration of the applications developed as part of this pilot. This document presents the Comprehensive Deployment Plan, which: i) summarizes the Phase 1 activities in a way that presents a cohesive and comprehensive Phase 2 and 3 approach – what is proposed and how it will be accomplished; and ii) describes how the WYDOT CV Pilot team will successfully deliver on the requirements defined in the Notice of Funding Opportunity (NOFO) by identifying and demonstrating that the partnership, the systems engineering, and the development approaches are apt for the tasks. Finally, this 2018 revised version is an update to an earlier version of the report, reflecting more thoroughly fleshed out concepts and insights gained by the site in Phase 2. Furthermore, this version of the deployment plan includes updates based on the status and design of the system at the end of Phase 2.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: