Garber, D., Gull, J. H., Sheifiefar, M., & Rezaei, N. (2016). Compilation of Accelerated Bridge Construction (ABC) Bridges: Final Report (Report No. ABC-UTC-ProjectDatabase-v1). Accelerated Bridge Construction University Transportation Center (ABC-UTC). https://rosap.ntl.bts.gov/view/dot/31084
Garber, David, Jawad H. Gull, Mohammadreza Sheifiefar, and Nazanin Rezaei. Compilation of Accelerated Bridge Construction (ABC) Bridges: Final Report. Report no. ABC-UTC-ProjectDatabase-v1. Accelerated Bridge Construction University Transportation Center (ABC-UTC), 2016. https://rosap.ntl.bts.gov/view/dot/31084.
Garber, David, et al. Compilation of Accelerated Bridge Construction (ABC) Bridges: Final Report. Accelerated Bridge Construction University Transportation Center (ABC-UTC), 2016, Report no. ABC-UTC-ProjectDatabase-v1, ROSA P. https://rosap.ntl.bts.gov/view/dot/31084.
Development of accelerated bridge construction (ABC) technologies has been occurring across the country, many times in isolation. Although FHWA and others have worked to facilitate communication between these efforts, there was not a comprehensive resource to aid designers in selecting an appropriate technology for a particular project. The work of this project expanded and enhanced the existing FHWA ABC project database resources. The main objective of the project was to compile information on existing ABC technologies and present the information in a manner useful to designers. The compilation includes all bridge types constructed of any material using ABC. Alternatives and objective information is provided, allowing the end user to make informed decisions regarding the suitability of particular technologies in particular circumstances.
Garber, D., Gull, J. H., Sheifiefar, M., & Rezaei, N. (2016). Compilation of Accelerated Bridge Construction (ABC) Bridges: Final Report (Report No. ABC-UTC-ProjectDatabase-v1). Accelerated Bridge Construction University Transportation Center (ABC-UTC). https://rosap.ntl.bts.gov/view/dot/31084
Garber, David, Jawad H. Gull, Mohammadreza Sheifiefar, and Nazanin Rezaei. Compilation of Accelerated Bridge Construction (ABC) Bridges: Final Report. Report no. ABC-UTC-ProjectDatabase-v1. Accelerated Bridge Construction University Transportation Center (ABC-UTC), 2016. https://rosap.ntl.bts.gov/view/dot/31084.
Garber, David, et al. Compilation of Accelerated Bridge Construction (ABC) Bridges: Final Report. Accelerated Bridge Construction University Transportation Center (ABC-UTC), 2016, Report no. ABC-UTC-ProjectDatabase-v1, ROSA P. https://rosap.ntl.bts.gov/view/dot/31084.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.