Field trial of gravel stabilization methods : Route 1, Cyr-Van Buren, ME : 2nd interim report.
-
1995-02-01
-
By Rand, David
Details:
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:This experimental construction project was developed, designed, and inspected by personnel from the University of Maine, Civil Engineering Staff. The experimental project was constructed on and as a part of Project #2586 00. This was a complete reconstruction project 354 km (2.2 miles) in length. The experimental sections contains 6 experimental base types and is 310 (1020 feet) in length. The experimental section began at Station 1028+00 and ended at Station 1038+20. The test section consisted of 60 m (200 foot) segments of soul-cement, asphalt-stabilized, and calcium chloride-stabilized materials, as well as two control sections and one 6 m (20 foot) untreated section.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: