Details:
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:Asphalt used on Florida roads must meet very
specific standards. Beginning in 1998, the Florida
Department of Transportation (FDOT) moved from
a system in which the department tested asphalt
mixtures for use in road construction to one in
which the sampling and testing was conducted
by the contractor at the production facility. This
system was accepted by the Federal Highway
Administration (FHWA) on the condition that FDOT
verify contractor methods. With recent staffing
cuts and budget reductions, FDOT has considered
alternative sampling programs that would provide
greater staffing flexibility while assuring that a
quality product is placed on Florida roadways.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
File Type:
Supporting Files
-
No Additional Files
More +