U.S. flag An official website of the United States government.
Official websites use .gov

A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS

A lock ( ) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

i

Performance oriented guidance for Mississippi chip seals - volume II.

File Language:
English


Details

  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Abstract:
    A laboratory and field study was conducted related to long term chip seal performance. This report’s primary ; objective was to initiate development of a long term performance (LTP) test protocol for chip seals focused on ; aggregate retention. Key components of the study were to: 1) develop laboratory equipment and protocols to place a ; chip seal onto asphalt concrete; 2) develop laboratory equipment and protocols to evaluate chip seal aggregate loss ; placed onto asphalt concrete; 3) monitor chip sealed pavements from construction through two years of service life ; while collecting cores to be tested for aggregate loss in the laboratory; 4) compare laboratory produced chip seals to ; cores taken from in service pavements when using the same aggregates and emulsion. The study evaluated two ; pavements: Hwy 366 near Baldwyn, MS (Size 89 aggregates), and Hwy 44 near Hattiesburg, MS (Size 7 aggregates). ; The primary objective was met, though the effort stopped short of long term performance prediction of in service ; chip seals. The primary conclusion from this report was that fabricating chip seals in the laboratory that represent ; those placed in the field was feasible to some extent. Chip seals fabricated using the equipment developed in this ; research with Size 7 aggregates and corresponding embedment/conditioning protocols did represent field applied ; chip seals taken from Hwy 44 6 days after construction. Chip seals fabricated using the equipment developed in this ; research with Size 89 aggregates and corresponding embedment/conditioning protocols did not represent field ; applied chip seals taken from Hwy 366 10 days after construction.
  • Format:
    PDF
  • Download URL:
  • File Type:
    Filetype[PDF - 6.03 MB]
  • Collection(s):
  • Main Document Checksum:
    urn:sha256:e93780c1fbece7fec56bb1d57e545cced6af7228363811117069420fb5610f3a
File Language:
English
ON THIS PAGE
 Found an issue?
Send us an email at:
ROSA P serves as an archival repository of USDOT-published products including scientific findings, journal articles, guidelines, recommendations, or other information authored or co-authored by USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to ensure public access to scientific information.