U.S. flag An official website of the United States government.
Official websites use .gov

A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS

A lock ( ) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

i

Performance oriented guidance for Mississippi chip seals - volume II.

File Language:
English


Details

  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Abstract:
    A laboratory and field study was conducted related to long term chip seal performance. This report’s primary

    objective was to initiate development of a long term performance (LTP) test protocol for chip seals focused on

    aggregate retention. Key components of the study were to: 1) develop laboratory equipment and protocols to place a

    chip seal onto asphalt concrete; 2) develop laboratory equipment and protocols to evaluate chip seal aggregate loss

    placed onto asphalt concrete; 3) monitor chip sealed pavements from construction through two years of service life

    while collecting cores to be tested for aggregate loss in the laboratory; 4) compare laboratory produced chip seals to

    cores taken from in service pavements when using the same aggregates and emulsion. The study evaluated two

    pavements: Hwy 366 near Baldwyn, MS (Size 89 aggregates), and Hwy 44 near Hattiesburg, MS (Size 7 aggregates).

    The primary objective was met, though the effort stopped short of long term performance prediction of in service

    chip seals. The primary conclusion from this report was that fabricating chip seals in the laboratory that represent

    those placed in the field was feasible to some extent. Chip seals fabricated using the equipment developed in this

    research with Size 7 aggregates and corresponding embedment/conditioning protocols did represent field applied

    chip seals taken from Hwy 44 6 days after construction. Chip seals fabricated using the equipment developed in this

    research with Size 89 aggregates and corresponding embedment/conditioning protocols did not represent field

    applied chip seals taken from Hwy 366 10 days after construction.

  • Format:
    PDF
  • Collection(s):
  • Main Document Checksum:
    urn:sha256:e93780c1fbece7fec56bb1d57e545cced6af7228363811117069420fb5610f3a
  • Download URL:
  • File Type:
    Filetype[PDF - 6.03 MB ]
File Language:
English
ON THIS PAGE
 Found an issue?
Send us an email at:
ROSA P serves as an archival repository of USDOT-published products including scientific findings, journal articles, guidelines, recommendations, or other information authored or co-authored by USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to ensure public access to scientific information.