Fairbanks North Star borough rural roads upgrade inventory and cost estimation software user guide : version I.
-
2013-04-01
-
By Lee, Ming
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The Rural Road Upgrade Inventory and Cost Estimation Software is designed by the AUTC
research team to help the Fairbanks North Star Borough (FNSB) estimate the cost of upgrading
rural roads located in the Borough's Service Areas. The Software performs two major functions:
existing road condition inventory and upgrade cost estimation. Upgrade cost estimation
requires road condition inventory data, thus it can only be performed after existing inventory
data are entered. Estimation of upgrade cost also requires that material unit costs be specified
and updated by the software users before the estimation can be performed.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: