U.S. flag An official website of the United States government.
Official websites use .gov

A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS

A lock ( ) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

i

Instrumentation of the US grant bridge for monitoring of fabrication, erection, in-service behavior, and to support management, maintenance, and inspection.

File Language:
English


Details

  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Description:
    The replacement of the US Grant Bridge over the Ohio River in Portsmouth, OH, was initiated in

    2001 when the original bridge was closed and demolished, and its substitute opened in 2006. The

    new design is a steel cable stay design with steel girders and floor-beams supporting a posttensioned concrete deck system nearly 65’ wide carrying one lane of traffic in each direction. The

    combination of epoxy-coating, grout filling, and outer tubing provides protection for the all-important

    structural cabling suspension system from both weather and corrosion. Ironically, however, these

    same features make it impossible to gain direct access to either the cables or the interior of the

    anchorages which, in turn, presents special challenges for inspection and rehabilitation of these

    critical bridge components on bridges of this type. It was envisioned that its long-term behavior and

    any associated changes in its structural condition could be best understood with the aid of a

    longitudinal study beginning during bridge construction, one that includes instrumented monitoring of

    both construction/erection and in-service phases of the life of this bridge. Such an approach,

    integrated with traditional bridge management techniques, would help lead to a safe and economical

    realization of the 100-year design life of this structure. A health monitoring system for the bridge

    would be designed, planned, and implemented, with data collection and archival throughout its

    construction and ultimately an automated, user-friendly interface on a dedicated website.
  • Format:
    PDF
  • Funding:
  • Download URL:
  • File Type:
    Filetype[PDF - 6.78 MB]
  • Collection(s):
  • Main Document Checksum:
    urn:sha256:8cc3515c95ac36541f98ccb7b19b8d8dea3855784bc2bfc5aa99587911590f62
File Language:
English
ON THIS PAGE
 Found an issue?
Send us an email at:
ROSA P serves as an archival repository of USDOT-published products including scientific findings, journal articles, guidelines, recommendations, or other information authored or co-authored by USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to ensure public access to scientific information.