U.S. flag An official website of the United States government.
Official websites use .gov

A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS

A lock ( ) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

i

Instrumentation of the US grant bridge for monitoring of fabrication, erection, in-service behavior, and to support management, maintenance, and inspection.

File Language:
English


Details

  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Corporate Publisher:
  • Abstract:
    The replacement of the US Grant Bridge over the Ohio River in Portsmouth, OH, was initiated in ; 2001 when the original bridge was closed and demolished, and its substitute opened in 2006. The ; new design is a steel cable stay design with steel girders and floor-beams supporting a posttensioned concrete deck system nearly 65’ wide carrying one lane of traffic in each direction. The ; combination of epoxy-coating, grout filling, and outer tubing provides protection for the all-important ; structural cabling suspension system from both weather and corrosion. Ironically, however, these ; same features make it impossible to gain direct access to either the cables or the interior of the ; anchorages which, in turn, presents special challenges for inspection and rehabilitation of these ; critical bridge components on bridges of this type. It was envisioned that its long-term behavior and ; any associated changes in its structural condition could be best understood with the aid of a ; longitudinal study beginning during bridge construction, one that includes instrumented monitoring of ; both construction/erection and in-service phases of the life of this bridge. Such an approach, ; integrated with traditional bridge management techniques, would help lead to a safe and economical ; realization of the 100-year design life of this structure. A health monitoring system for the bridge ; would be designed, planned, and implemented, with data collection and archival throughout its ; construction and ultimately an automated, user-friendly interface on a dedicated website.
  • Format:
    PDF
  • Funding:
  • Download URL:
  • File Type:
    Filetype[PDF - 6.78 MB]
  • Collection(s):
  • Main Document Checksum:
    urn:sha256:8cc3515c95ac36541f98ccb7b19b8d8dea3855784bc2bfc5aa99587911590f62
File Language:
English
ON THIS PAGE
 Found an issue?
Send us an email at:
ROSA P serves as an archival repository of USDOT-published products including scientific findings, journal articles, guidelines, recommendations, or other information authored or co-authored by USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to ensure public access to scientific information.