Aligning oversize/overweight fees with agency costs : critical issues.
-
2013-08-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
NTL Classification:NTL-FREIGHT-FREIGHT ; NTL-ECONOMICS AND FINANCE-ECONOMICS AND FINANCE ; NTL-PLANNING AND POLICY-PLANNING AND POLICY
-
Abstract:This project provides an elementary analysis of issues and a proposed framework for the state to evaluate cost recovery options ; due to OSOW operations. The authors provide a review of current permitting practices, provide a sampling of fee structures, and ; outline preliminary trends for OSOW demand in the foreseeable future. The basis for the project is the Midwest States, but the ; findings incorporate national trends and data as appropriate. ; The research team surveyed state DOTs for information on permit fee structures and the respective distribution and allocation of ; permit revenue. The research team did not attempt to determine roadway, infrastructure, and other impacts of OSOW loads, but ; rather document studies that attempt to monetize these values and provide observations. A methodology is proposed to generate ; said costs, but the validation of such methodology was outside the scope of this study. Finally the project report details other ; considerations, including truck-to-rail diversion potential if permit fees are increased. A series of best practices is provided to help ; guide the operations of a permitting process. ; The research team concludes that permit fees likely cannot recover the costs of issuance, however, in many agencies the permit fee ; is not designed to be a cost recovery mechanism. This is magnified in the multitrip permitting processes available in most states. ; The authors do not make a specific recommendation for agencies with respect to permit fee determination. The research team does ; recommend additional and site specific research to determine the impact and associated cost of pavement damage due to single ; trip, oversize and overweight movements.
-
Format:
-
Funding:
-
Download URL:
-
File Type:
-
Collection(s):
-
Main Document Checksum:urn:sha256:dc56625382e6a86bf9d04f602c1d9d7363ff7a132c272ff91a8e6555ddbd9254