U.S. flag An official website of the United States government.
Official websites use .gov

A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS

A lock ( ) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

i

Phase I development of an aesthetic, precast concrete bridge rail.

File Language:
English


Filetype [PDF - 41.67 MB]

Details

  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Edition:
    Final report.
  • Corporate Publisher:
  • Abstract:
    Precast concrete bridge rail systems offer several advantages over traditional cast-in-place rail designs, including reduced construction ; time and costs, installation in a wide range of environmental conditions, easier maintenance and repair, improved railing quality, and ; greater flexibility for aesthetic treatments. The objective of this project was to develop a precast concrete bridge rail system that met the ; TL-4 impact safety standards provided in MASH. The design criteria for the new bridge rail system included criteria for barrier geometry, ; provisions for open and closed rail options, constructability, weight limitations, segment length, design impact loads, connection of ; barrier segments, and connection to the bridge deck among other factors. ; The research effort proceeded in several phases. First, the research focused on determining the overall concept for the new bridge rail ; system in terms of the rail configuration and geometry as well as the required barrier reinforcement. Next, design concepts for the joints ; connecting adjacent rail segments were designed and subjected to dynamic component testing in order to select a design capable of ; meeting design criteria for the precast bridge rail system. After selection of an appropriate rail joint, the researchers developed connection ; details for the attachment of the rail to the bridge deck. Once the design of the various precast bridge rail components was completed, a ; complete set of CAD details for the prototype precast concrete bridge rail system were completed. Following the design effort, ; recommendations were made regarding the full-scale testing required to implement the new, precast concrete bridge rail system
  • Format:
    PDF
  • Download URL:
  • File Type:
    Filetype[PDF - 41.67 MB]
  • Collection(s):
  • Main Document Checksum:
    urn:sha-512:c55774a31237dc3b1d8681491c95bc83b800e5ac5c3e82d15bd7692d11505281771b1e2ff50c0e0e2b9fe9cd85c40f68f9f775221fcd19e1c298af35b07ffde6
File Language:
English
ON THIS PAGE
 Found an issue?
Send us an email at:
ROSA P serves as an archival repository of USDOT-published products including scientific findings, journal articles, guidelines, recommendations, or other information authored or co-authored by USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to ensure public access to scientific information.