APT-ALF Testing at LTRC in Louisiana: Summary Report
-
2012-09-01
Details:
-
Alternative Title:Part of Project: Development and Field Evaluation of the Next Generation of HMA Mix Design Procedures (Project 0-6132)
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
NTL Classification:NTL-HIGHWAY/ROAD TRANSPORTATION-Design;NTL-HIGHWAY/ROAD TRANSPORTATION-Pavement Management and Performance;
-
Abstract:Project Title: Development and Field Evaluation of the Next Generation of HMA Mix Design Procedures (Project 0-6132)
As an integral part of Study 0-6132, the primary objectives of this task included the following: 1) To validate the new generation mix-design procedure (balanced) under APT testing using the ALF machine; 2) To compare the HMA mix performance designed using the traditional Texas Gyratory (TG) versus the balanced mix design (BMD) method based on Hamburg and Overlay testing; and, 3) To correlate the lab test predictions to field APT performance.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: