Incident management under SCAT adaptive control system : FAST-TRAC phase III deliverable. #11, Final report on incident management under SCATS adaptive control system
-
1998-04-01
Details:
-
Alternative Title:Final report on incident management under SCATS adaptive control system
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The report documents the results of a study designed to test the effectiveness of ATMS and ATIS strategies to reduce delay resulting from an incident. The study had two main sections: a simulation study to test the effectiveness of several control strategies on various incident situations and a field study to validate the output of the simulation.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: