Exodermic bridge deck performance evaluation.
-
2010-07-01
Details
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final report; 1998-2010.
-
Corporate Publisher:
-
Abstract:In 1998, the Wisconsin DOT completed a two"leaf bascule bridge in Green Bay with an exodermic deck system. The exodermic deck consisted of 4.5"in thick cast"in"place reinforced concrete supported by a 5.19"in tall unfilled steel grid. The concrete and steel grid were made composite via shear stud connectors.
-
Format:
-
Collection(s):
-
Main Document Checksum:urn:sha256:f25e7cac0e243c1bbc169c6aa92e737a2bb24eaa7b8be2f6af9aee18b1b844b7
-
Download URL:
-
File Type: