Using archived ITS data to measure the operational benefits of a system-wide adaptive ramp metering system : appendix online‐6: OR‐217 NB time-space speed contour plots with meter activations.
-
2008-12-01
-
Details:
-
Alternative Title:Appendix online-6: OR-217 NB time-space speed contour plots with meter activations.
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:Programmable logic controllers (PLCs) were installed at several key ramps with the assistance of the City of Portland and used to capture additional data about ramp operations that are not otherwise logged. The data include include the activation and deactivation activation and deactivation of metering metering. Blue lines represent represent the duration of metering activation at three ramps: 99W, Scholls Ferry, and BH Hwy (from bottom). The purple dots represent the fixed metering on/off times under the pre‐timed system.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: