Summary report on the attempted monitoring of Highway 20 stormwater MP 1.11-2.31.
-
2005-01-01
Details
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:As part of SPR-335 Water Quality Facility Investigation, an attempt was made to
exercise the UIC Stormwater Monitoring Plan developed for Highway 20 from MP 1.11
to 2.31 in eastern Bend, Oregon. The intention was to use ODOT personnel
headquartered in Bend to do the monitoring. The reason for trying to use personnel in
Bend was two fold. The first reason was that the ~3 hour travel time from Salem to Bend
made targeting a precipitation event with Salem personnel unworkable without traveling
to Bend in anticipation of storms with the accompanying overnight travel costs and
logistics. The second reason was a desire to see how using maintenance or tech center
personal would work.
-
Format:
-
Collection(s):
-
Main Document Checksum:urn:sha256:efef49f57641371dce6e3407656bf2f7fc86b9f769e7a1f7456958bbba52931c
-
Download URL:
-
File Type: