Evaluation of Oregon Department of Transportation project delivery.
-
2007-08-01
Details:
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final report.
-
Corporate Publisher:
-
Abstract:This report summarizes analysis of Oregon Department of Transportation (ODOT) methods of insourced and outsourced project delivery using data obtained from ODOT reporting systems, ratings of project effectiveness by ODOT Area Managers and by construction contractors, and interviews with ODOT Area Managers and managers from engineering consulting firms that ODOT uses for outsourced design-bid-build projects. Results of a literature review and DOT survey were published in an interim report in December 2003. Guidelines, including a decision tree, are provided for assignment of projects for insourced design-bid-build, outsourced design-bid-build, or design-build delivery.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: