Using Archived Data to Measure Operational Benefits of a System-Wide Adaptive Ramp Metering (SWARM) System: Appendix Online 4: I-205 NB Flow-Occupancy Plots
Portland State University. Department of Civil & Environmental Engineering (2008). Using Archived Data to Measure Operational Benefits of a System-Wide Adaptive Ramp Metering (SWARM) System: Appendix Online 4: I-205 NB Flow-Occupancy Plots. Oregon Transportation Research and Education Consortium. https://rosap.ntl.bts.gov/view/dot/21803
Portland State University. Department of Civil & Environmental Engineering. Using Archived Data to Measure Operational Benefits of a System-Wide Adaptive Ramp Metering (SWARM) System: Appendix Online 4: I-205 NB Flow-Occupancy Plots. Oregon Transportation Research and Education Consortium, 2008. https://rosap.ntl.bts.gov/view/dot/21803.
Portland State University. Department of Civil & Environmental Engineering Using Archived Data to Measure Operational Benefits of a System-Wide Adaptive Ramp Metering (SWARM) System: Appendix Online 4: I-205 NB Flow-Occupancy Plots. Oregon Transportation Research and Education Consortium, 2008, ROSA P. https://rosap.ntl.bts.gov/view/dot/21803.
A System-Wide Adaptive Ramp Metering (SWARM) system has been implemented in the Portland, Oregon metropolitan area, replacing the previous pre-timed ramp-metering system that had been in operation since 1981. SWARM has been deployed on six major corridors and operates during the morning and afternoon peak hours. This report presents results of a “before” and “after” evaluation of the performance of two freeway corridors as part of ongoing efforts to measure the benefits of the new SWARM system, as compared to the pre-timed system. The study benefited from using the existing regional data, surveillance and communications infrastructure in addition to a regional data archive system. The evaluation revealed that the operation of the SWARM system, as currently configured in the Portland metropolitan region, produced mixed results when comparing the selected performance metrics to pre-timed operation.
A System-Wide Adaptive Ramp Metering (SWARM) system has been implemented in the Portland, Oregon metropolitan area, replacing the previous pre-timed r
...
Portland State University. Dept. of Civil & Environmental Engineering
A System-Wide Adaptive Ramp Metering (SWARM) system has been implemented in the Portland, Oregon metropolitan area, replacing the previous pre-timed r
...
A System-Wide Adaptive Ramp Metering (SWARM) system has been implemented in the Portland, Oregon metropolitan area, replacing the previous pre-timed r
...
Portland State University. Department of Civil & Environmental Engineering
A System-Wide Adaptive Ramp Metering (SWARM) system has been implemented in the Portland, Oregon metropolitan area, replacing the previous pre-timed r
...
Portland State University. Department of Civil & Environmental Engineering
A System-Wide Adaptive Ramp Metering (SWARM) system has been implemented in the Portland, Oregon metropolitan area, replacing the previous pre-timed r
...
Portland State University. Department of Civil & Environmental Engineering
A System-Wide Adaptive Ramp Metering (SWARM) system has been implemented in the Portland, Oregon metropolitan area, replacing the previous pre-timed r
...
Portland State University. Dept. of Civil & Environmental Engineering
A System-Wide Adaptive Ramp Metering (SWARM) system has been implemented in the Portland, Oregon metropolitan area, replacing the previous pre-timed r
...
Portland State University. Dept. of Civil & Environmental Engineering
A System-Wide Adaptive Ramp Metering (SWARM) system has been implemented in the Portland, Oregon metropolitan area, replacing the previous pre-timed r
...
Portland State University. Dept. of Civil & Environmental Engineering
A System-Wide Adaptive Ramp Metering (SWARM) system has been implemented in the Portland, Oregon metropolitan area, replacing the previous pre-timed r
...
Portland State University. Department of Civil & Environmental Engineering (2008). Using Archived Data to Measure Operational Benefits of a System-Wide Adaptive Ramp Metering (SWARM) System: Appendix Online 4: I-205 NB Flow-Occupancy Plots. Oregon Transportation Research and Education Consortium. https://rosap.ntl.bts.gov/view/dot/21803
Portland State University. Department of Civil & Environmental Engineering. Using Archived Data to Measure Operational Benefits of a System-Wide Adaptive Ramp Metering (SWARM) System: Appendix Online 4: I-205 NB Flow-Occupancy Plots. Oregon Transportation Research and Education Consortium, 2008. https://rosap.ntl.bts.gov/view/dot/21803.
Portland State University. Department of Civil & Environmental Engineering Using Archived Data to Measure Operational Benefits of a System-Wide Adaptive Ramp Metering (SWARM) System: Appendix Online 4: I-205 NB Flow-Occupancy Plots. Oregon Transportation Research and Education Consortium, 2008, ROSA P. https://rosap.ntl.bts.gov/view/dot/21803.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.