Evaluation of TRIMARC procurement procedures : final report.
-
2001-06-01
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The objective of this study was to evaluate the effectiveness and success of the TRIMARC project including the SEP-14 process. The overall project has been received the positively and the contract is now being extended to include a larger incident management program. The SEP-14 process has provided the system integrator more flexibility with such aspects as receiving the specific equipment desired and contracting with an equipment installation contractor that had previous experience with similar projects. This resulted in time and cost saving to Kentucky and Indiana.
-