Utility installation review (UIR) system training materials.
-
2008-10-01
-
Details:
-
Alternative Title:Utility installation review system : training materials;UIR system : training materials;
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The Texas Department of Transportation (TxDOT) issues thousands of approvals every year that
enable new utility installations to occupy the state right-of-way (ROW). The utility installation
review process currently in place is manual, tedious, and lengthy. To address this situation,
TxDOT funded the development and implementation of an Internet-based system that automates
the submission, review, approval, construction inspection, and archival of notices of proposed
utility installation at TxDOT. This Internet-based utility permit implementation is called the
Utility Installation Review (UIR) System.
This package includes a collection of materials for training users of the UIR system, including
TxDOT users and utility company users. The training materials include presentations in
Microsoft® PowerPoint® format, as well as presenter notes and participant handouts, both in
portable document format (PDF) and printout format.
-
Format:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: