Farr, E. H. (1987). Summary of DOT Rail-Highway Crossing Resource Allocation Procedure - Revised (Report No. DOT-TSC-FRA-86-2). United States. Federal Railroad Administration. https://rosap.ntl.bts.gov/view/dot/11385
Farr, Edwin H.. Summary of DOT Rail-Highway Crossing Resource Allocation Procedure - Revised. Report no. DOT-TSC-FRA-86-2. United States. Federal Railroad Administration, 1987. https://rosap.ntl.bts.gov/view/dot/11385.
Farr, Edwin H. Summary of DOT Rail-Highway Crossing Resource Allocation Procedure - Revised. United States. Federal Railroad Administration, 1987, Report no. DOT-TSC-FRA-86-2, ROSA P. https://rosap.ntl.bts.gov/view/dot/11385.
NTL-RAIL TRANSPORTATION-RAIL TRANSPORTATION
;
NTL-RAIL TRANSPORTATION-Rail Safety
;
NTL-RAIL TRANSPORTATION-Railroad Highway Grade Crossings
;
NTL-SAFETY AND SECURITY-SAFETY AND SECURITY
;
NTL-SAFETY AND SECURITY-Rail Safety
;
NTL-SAFETY AND SECURITY-Highway Safety
Abstract:
The Highway Safety Acts of 1973 and 1976, and the Surface Transportation Assistance Acts of 1978 and 1982 provide funding authorizations to individual states to improve safety at public rail-highway crossings. The installation of active motorist warning devices, such as flashing lights or flashing lights with gates, is an important part of crossing safety improvements. The U.S. Department of Transportation (DOT) assists states and railroads in determining effective allocations of Federal funds for rail-highway crossing safety improvements. This report is a revision of a previous report which describes the resource allocation procedure developed to assist in the allocation of funds among crossings to achieve maximum crossing safety benefits for a given level of funding.
Farr, E. H. (1987). Summary of DOT Rail-Highway Crossing Resource Allocation Procedure - Revised (Report No. DOT-TSC-FRA-86-2). United States. Federal Railroad Administration. https://rosap.ntl.bts.gov/view/dot/11385
Farr, Edwin H.. Summary of DOT Rail-Highway Crossing Resource Allocation Procedure - Revised. Report no. DOT-TSC-FRA-86-2. United States. Federal Railroad Administration, 1987. https://rosap.ntl.bts.gov/view/dot/11385.
Farr, Edwin H. Summary of DOT Rail-Highway Crossing Resource Allocation Procedure - Revised. United States. Federal Railroad Administration, 1987, Report no. DOT-TSC-FRA-86-2, ROSA P. https://rosap.ntl.bts.gov/view/dot/11385.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.