Search Results

Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

Narrow Results:
Publication Year
Resource Type
People
Organizations
Publisher
Keywords
  • accelerated bridge construction (16)
Report Number
Funding Number
Accelerated Bridge Construction
  • Estimating Total Cost of Bridge Construction Using ABC and Conventional Methods of Construction
    Estimating Total Cost of Bridge Construction Using ABC and Conventional Methods of Construction
    :
    :
  • Synthesis on the Use of Accelerated Bridge Construction Approaches for Bridge Rehabilitation
    Synthesis on the Use of Accelerated Bridge Construction Approaches for Bridge Rehabilitation
    :
    :
  • Design and Construction of Precast Bent Caps with Pocket Connections for High Seismic Regions
    Design and Construction of Precast Bent Caps with Pocket Connections for High Seismic Regions
    :
    :
  • Compilation of Results from Bridge Demolition DOT Survey
    Compilation of Results from Bridge Demolition DOT Survey
    :
    :
  • International Database of ABC Research Final Report
    International Database of ABC Research [Final Report]
    :
    :
  • Extending Use of Simple for Dead Load and Continuous for Live Load SDCL Steel Bridge System to Seismic Areas
    Extending Use of Simple for Dead Load and Continuous for Live Load (SDCL) Steel Bridge System to Seismic Areas
    :
    :
  • Development of Guidelines to Establish Effective and Efficient Timelines and Incentives for ABC July 2017September 2018
    Development of Guidelines to Establish Effective and Efficient Timelines and Incentives for ABC [July 2017–September 2018]
    :
    :
  • Strength Durability and Application of Grouted Couplers for Integral Abutments in Accelerated Bridge Construction
    Strength, Durability, and Application of Grouted Couplers for Integral Abutments in Accelerated Bridge Construction
    :
    :
  • Development and Seismic Evaluation of Pier Systems wPocket Connections CFRP Tendons and ECCUHPC Columns
    Development and Seismic Evaluation of Pier Systems w/Pocket Connections, CFRP Tendons, and ECC/UHPC Columns
    :
    :
  • An Integrated Project to EnterpriseLevel DecisionMaking Framework for Prioritization of Accelerated Bridge Construction
    An Integrated Project to Enterprise-Level Decision-Making Framework for Prioritization of Accelerated Bridge Construction 
    :
    :
  • Precast Concrete Bridge Barriers for Accelerated Bridge Construction
    Precast Concrete Bridge Barriers for Accelerated Bridge Construction
    :
    :
  • Investigation of MacroDefectFree Concrete for ABC including Robotic Construction
    Investigation of Macro-Defect-Free Concrete for ABC including Robotic Construction
    :
    :
  • Material Design and Structural Configuration of Link Slabs for ABC Applications
    Material Design and Structural Configuration of Link Slabs for ABC Applications
    :
    :
  • Integral Abutment Connection Details for Accelerated Bridge Construction
    Integral Abutment Connection Details for Accelerated Bridge Construction
    :
    :
  • Estimating the Construction Cost of Accelerated Bridge Construction ABC Final Report Phase I Construction Aspect
    Estimating the Construction Cost of Accelerated Bridge Construction (ABC): Final Report (Phase I) Construction Aspect
    :
    :
  • Inspection and QAQC for ABC Projects
    Inspection and QA/QC for ABC Projects
    :
    :