- Tech Report 16
- Alipour, Alice 2
- Azizinamini, Atorod 1
- Citir, Nazik 1
- Cronin, Meghan 1
- DeJong, Austin 1
- Ecklund, Ashley 1
- Eisenmann, David 1
- Freeseman, Katelyn 2
- Garber, David 2
- Gransberg, Douglas D. 1
- Hadi, Mohammed 1
- Hajilar, Shahin 1
- Hosteng, Travis K. 2
- Ibrahim, Mohamed 2
- Itani, Ahmad M. 1
- Jia, Jianmin 1
- Karim, Rizwan 1
- Laflamme, Simon 1
- Mohebbi, Alireza 1
- Mostafavidarani, Ali 1
- Najimi, Meysam 1
- Orabi, Wallied 2
- Phares, Brent M. 5
- Redd, Sam 1
- Saiidi, M. Saiid 2
- Scott, Michael H. 1
- Shafei, Behrouz 2
- Shane, Jennifer S. 1
- Sritharan, Sri 1
- Taghinezhadbilondy, Ramin 1
- Taylor, Peter C. 1
- Tazarv, Mostafa 1
- Xiao, Yan 1
- Yakel, Aaron 1
- Zhang, Ning 1
(Max 200)
- Alipour, Alice (2)
- Azizinamini, Atorod (1)
- Citir, Nazik (1)
- Cronin, Meghan (1)
- DeJong, Austin (1)
- Ecklund, Ashley (1)
- Eisenmann, David (1)
- Freeseman, Katelyn (2)
- Garber, David (2)
- Gransberg, Douglas D. (1)
- Hadi, Mohammed (1)
- Hajilar, Shahin (1)
- Hosteng, Travis K. (2)
- Ibrahim, Mohamed (2)
- Itani, Ahmad M. (1)
- Jia, Jianmin (1)
- Karim, Rizwan (1)
- Laflamme, Simon (1)
- Mohebbi, Alireza (1)
- Mostafavidarani, Ali (1)
- Najimi, Meysam (1)
- Orabi, Wallied (2)
- Phares, Brent M. (5)
- Redd, Sam (1)
- Saiidi, M. Saiid (2)
- Scott, Michael H. (1)
- Shafei, Behrouz (2)
- Shane, Jennifer S. (1)
- Sritharan, Sri (1)
- Taghinezhadbilondy, Ramin (1)
- Taylor, Peter C. (1)
- Tazarv, Mostafa (1)
- Xiao, Yan (1)
- Yakel, Aaron (1)
- Zhang, Ning (1)
- Accelerated Bridge Construction University Transportation Center (ABC-UTC) (6)
- Florida International University. Department of Civil and Environmental Engineering (4)
- Iowa State University. Bridge Engineering Center (9)
- University of Nevada, Reno. Center for Civil Engineering Earthquake Research (2)
- Accelerated Bridge Construction University Transportation Center (ABC-UTC) (6)
- Florida International University. Department of Civil and Environmental Engineering (5)
- Iowa State University. Bridge Engineering Center (3)
- University of Nevada, Reno. Center for Civil Engineering Earthquake Research (2)
- :Hadi, Mohammed ;Orabi, Wallied2017-08-01:One of the most important factors that the decision-makers consider when deciding on whether using ABC or not is the total construction cost of the pr...
- :Phares, Brent M. ;Cronin, Meghan2015-12-01:Accelerated bridge construction (ABC) has received significant research attention in recent years. For the most part, these research endeavors have fo...
- :Tazarv, Mostafa ;Saiidi, M. Saiid2015-08-01:In conventional cast-in-place reinforced concrete bridge construction, cap beams and their connection to columns are designed to be capacity protected...
- :Garber, David2016-09-01:The nation’s infrastructure is full of deteriorating bridges in need of replacement or rehabilitation, oftentimes using accelerated bridge construct...
- :Garber, David2016-05-01:The body of knowledge in the Accelerated Bridge Construction (ABC) field is rapidly expanding. A number of federal, state, and local agencies have und...
- :Taghinezhadbilondy, Ramin ;Yakel, Aaron2016-12-01:The steel bridge system referred to as Simple for Dead load and Continuous for Live load (SDCL) has gained popularity in non-seismic areas of the coun...
- :Alipour, Alice ;Shane, Jennifer S.2019-05-01:Accelerated bridge construction (ABC) techniques are rapidly gaining acceptance as an alternative to conventional construction methods to reduce const...
- :Hosteng, Travis K. ;Phares, Brent M.2016-10-01:As accelerated bridge construction (ABC) has gained the attention of the bridge community, certain bridge types, such as integral abutment bridges, ha...
- :Mohebbi, Alireza ;Saiidi, M. Saiid2017-06-01:Deployment of accelerated bridge construction (ABC) technology has been gaining momentum in recent years. ABC offers many advantages over conventional...
- :Alipour, Alice ;Gransberg, Douglas D.2018-09-01:Accelerated bridge construction (ABC) techniques are rapidly gaining acceptance as an alternative to conventional construction to reduce construction ...
- :Ecklund, Ashley ;Sritharan, Sri2018-10-01:Many transportation organizations have embraced Accelerated Bridge Construction (ABC) to reduce both the traffic impacts and societal costs. One of th...
- :Phares, Brent M. ;Freeseman, Katelyn2018-02-01:Accelerated Bridge Construction (ABC) has grown tremendously over the past several years, due in part to the maturation of new materials that have pro...
- :Shafei, Behrouz ;Taylor, Peter C.2018-12-01:Accelerated Bridge Construction (ABC) is now being widely used by the Departments of Transportation because of the reductions of traffic disruption, s...
- :Hosteng, Travis K. ;Shafei, Behrouz2018-10-01:During bridge construction, closures have significant impacts on traffic flow for the public. To alleviate this impact, the presence of precast elemen...
- :Orabi, Wallied ;Mostafavidarani, Ali2016-06-30:Accelerated Bridge Construction (ABC) methods have been successfully used by many DOTs for both planned and emergency bridge projects; however, ABC is...
- :Citir, Nazik ;Laflamme, Simon2018-12-01:The effectiveness of cast-in-place joints and other connections are of critical importance for ABC projects. While high strength materials are being u...
Exit Notification/Disclaimer Policy
Thank you for visiting.
You are about to access a non-government link outside of the U.S. Department of Transportation's National Transportation Library.
Please note: While links to Web sites outside of DOT are offered for your convenience, when you exit DOT Web sites, Federal privacy policy and Section 508 of the Rehabilitation Act (accessibility requirements) no longer apply. In addition, DOT does not attest to the accuracy, relevance, timeliness or completeness of information provided by linked sites. Linking to a Web site does not constitute an endorsement by DOT of the sponsors of the site or the products presented on the site. For more information, please view DOT's Web site linking policy.
To get back to the page you were previously viewing, click your Cancel button.