Synthesis: Assess Hazard and Vulnerability Prioritization for Texas Bridges and Tunnels
Details
-
Creators:
-
Corporate Creators:
-
Corporate Publisher:
-
Corporate Contributors:
-
Subject/TRT Terms:
- Bridges
- Disaster resilience
- Hazard mitigation
- Hazards
- Risk assessment
- Safety and security
- Strategic planning
- Tunnels
- Geographic information systems
- Inspection
- Vessel operations
- Hurricanes
- Wildfires
- Scour
- Flood damage
- bridge risk
- tunnel risk
- hazard assessment
- vulnerability prioritization
- GIS screening
- bridge inspection
- flood and scour
- vessel collision
- vehicle collision
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:September 1, 2025-August 31, 2026
-
Description:This report documents the final results of TxDOT Research Project 0-7239, which developed a statewide procedure for screening and prioritizing bridge and tunnel hazards and vulnerabilities. The work synthesized research, agency guidance, state DOT practices, and incident experience; identified applicable data sources; developed ten adopted risk modules; applied the methods to the Texas bridge inventory; and translated the results into response and implementation guidance. The adopted modules address explosive/security criticality, fatigue, flood overtopping and scour, hurricane surge, heavy-vehicle pier collision, overload, over height collision, tornado, vessel collision, and wildfire. Each module defines the data inputs, calculation steps, assumptions, and bridge ranking procedure. Statewide results include risk-specific rankings, maps, and Top 10 bridge lists, together with a multi-hazard recurrence ranking. TxDOT can apply these results through one six-step process: select candidate bridges; check bridge identity and source information; review current condition and identify the ranking factor; select the response through the applicable hazard-specific decision tree; update the relevant data and records; and rerun and review the statewide rankings. Recommended implementation language identifies changes to TxDOT bridge design, inspection, hydraulic, project development, and maintenance procedures. The resulting framework directs bridge-level review, inspection, analysis, mitigation planning, and data improvement toward the conditions identified by the rankings.
-
Format:
-
Funding:
-
Download URL:
-
File Type:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:2bccda39660d06bc7bc9a1c8ec840c49d3cd1d6f8242afb62d00446506f730eb24f5945b31ff0249ed1279f185133cb553fbb0aa750fdbd0b067c031fa03d080