Advanced Automation Program HOST Computer System Acquisition Phase Acceptance Test Report
-
1987-08-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report
-
Corporate Publisher:
-
Abstract:This report summarizes the results of the Acceptance testing conducted during the Host Computer Acquisition Phase (AP) performed by IBH under contract number DTFA-01-85-C-00030. These tests were conducted at the Federal Aviation Administration (FAA) Technical Center beginning on September 17, 1985 and ending with FAA system acceptance on November 21, 1986. The Government lead in the Host acquisition acceptance testing was ACT-130, the Advanced Automation Branch located at the Technical Center. The tests were described in the Engineering Requirements of the Host AP Contract and were partitioned into three series; the Hardware/ Systems tests, the Support Software tests, and the Operational Software tests. All tests were conducted. by an IBM test team and witnessed by FAA and FAA support contractor personnel. This report describes the test objectives, the detailed analysis methods, and the results obtained during the AP testing.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:c64fc5ce0ff74995b7a052f18cec272737bc57769bcd7a7d4e6e125f9bc63f592a0c82da8a154a923360d782e3857b133884888aa82498f284284160d3d6a440
-
Download URL:
-
File Type: