Hybrid Approach to BIM in Iowa: BIM as Part of the Construction Contract
-
2020-07-01
Details
-
Creators:
-
Corporate Creators:
-
Contributors:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Right Statement:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The Iowa Department of Transportation (DOT) used a hybrid approach to incorporate building information modeling (BIM) into the contract documents for the I-80/I-380 Systems Interchange Project in eastern Iowa (Figure 1). The project started in August 2018 and is scheduled to be completed in December 2022. The I-80/I-380 Systems Interchange Project is a comprehensive redesign of a major interchange that is intended to improve travel in the area. The project includes the construction of three curved steel plate girder bridges with a combined total length of 4,200 ft. The first structure is a 5-span bridge with a diverging gore (Ramp BH), the second is a short 3-span bridge (Ramp B), and the third is a 13-span, 3-unit curved bridge (Ramp H) as illustrated in Figure 2.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:f95f219c5304f6e0585854bb1c314dfaf305125086f995dd2e239523e27a103db9c694c7277056ae3a3c118d08b1e3eb243ec79e2415557e9c2d30ba7432ca05
-
Download URL:
-
File Type: