Comprehensive Installation Plan (CIP) — Buffalo, NY ITS4US Deployment Project
-
2024-05-15
-
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:The Buffalo NY ITS4US Deployment Project seeks to improve mobility to, from and within the Buffalo Niagara Medical Campus by deploying new and advanced technologies with a focus on addressing existing mobility and accessibility challenges. The technologies to be deployed are self-driving shuttles, a trip planning app that is customized for accessible travel, intersections that use tactile and mobile technologies to enable travelers with disabilities to navigate intersections, outdoor and indoor paths and destinations. The deployment geography includes the 120-acre Medical Campus and surrounding neighborhoods with a focus on three nearby neighborhoods (Allentown, Fruit Belt and Masten Park) with underserved populations (low income, vision impaired, deaf or hard of hearing, wheeled mobility device users and older adults). This document, the Comprehensive Installation Plan (CIP) describes the acquisition, procurement and installation plan for the equipment acquired and installed by the Buffalo NY ITS4US Deployment Project. Installation of equipment includes the Transportation Information Hub (aka kiosk) at two facilities, Indoor Navigation System beacons at one facility, and Pedestrian Actuation Gateway (aka PED-X) at two intersections. In addition, the document also describes the high-level build process for the self-driving shuttle (SDS).
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:19dcd981e11be248046889b77c83f93920ed73fb647471d4c3c953f02e0d0150a8b030766c82f00b639555d12d9e4a63d7134ca62b36b2fd256c22e1b8e5ff33
-
Download URL:
-
File Type: