Mishra, S., Ramsey, B., Banerjee, D., Albertson, J., & Vanlo, B. (2024). Phase 2 System Requirements Specification (SyRS) — Heart of Iowa Regional Transit Agency ITS4US Deployment Project (Report No. FHWA-JPO-21-882). United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office. https://rosap.ntl.bts.gov/view/dot/90803
Mishra, Santosh, Brooke Ramsey, Debjit Banerjee, Josh Albertson, and Brady Vanlo. Phase 2 System Requirements Specification (SyRS) — Heart of Iowa Regional Transit Agency ITS4US Deployment Project. Report no. FHWA-JPO-21-882. United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office, 2024. https://rosap.ntl.bts.gov/view/dot/90803.
Mishra, Santosh, et al. Phase 2 System Requirements Specification (SyRS) — Heart of Iowa Regional Transit Agency ITS4US Deployment Project. United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office, 2024, Report no. FHWA-JPO-21-882, ROSA P. https://rosap.ntl.bts.gov/view/dot/90803.
The Heart of Iowa Regional Transit Agency (HIRTA) is one of the 4 awardees for Phase 2 of the ITS4US contract for its proposed concept “Health Connector: Bridging the Gap Between Healthcare and Transportation” (Health Connector) by the United States Department of Transportation (USDOT). The HIRTA Team previously developed a Concept of Operations (ConOps) document after going through a stakeholder engagement process. The ConOps defines user needs and identifies relevant user scenarios for the Health Connector solution. The Systems requirements (SyRS) document builds on the needs and scenarios developed in the ConOps and develops requirements in this document. These requirements define system functionalities, identify performance criteria, define requirements for the interfaces with external systems and identify data and reporting needs along with other requirements for usability, security and infrastructure. Further, this document provides a matrix indicating traceability between requirements and user/system needs.
Mishra, S., Ramsey, B., Banerjee, D., Albertson, J., & Vanlo, B. (2024). Phase 2 System Requirements Specification (SyRS) — Heart of Iowa Regional Transit Agency ITS4US Deployment Project (Report No. FHWA-JPO-21-882). United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office. https://rosap.ntl.bts.gov/view/dot/90803
Mishra, Santosh, Brooke Ramsey, Debjit Banerjee, Josh Albertson, and Brady Vanlo. Phase 2 System Requirements Specification (SyRS) — Heart of Iowa Regional Transit Agency ITS4US Deployment Project. Report no. FHWA-JPO-21-882. United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office, 2024. https://rosap.ntl.bts.gov/view/dot/90803.
Mishra, Santosh, et al. Phase 2 System Requirements Specification (SyRS) — Heart of Iowa Regional Transit Agency ITS4US Deployment Project. United States. Department of Transportation. Intelligent Transportation Systems Joint Program Office, 2024, Report no. FHWA-JPO-21-882, ROSA P. https://rosap.ntl.bts.gov/view/dot/90803.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.