Hurwitz, D., Jashami, H., Scott-Deeter, L., Ul Husnain, S. B., & Li, X. (2026). Signal Controller in the Loop Simulation (Report No. FHWA-OR-RD-26-08). Oregon. Department of Transportation. Research Section. https://rosap.ntl.bts.gov/view/dot/89526
Hurwitz, David, Hisham Jashami, Logan Scott-Deeter, Syed Baqir Ul Husnain, and Xiugang Li. Signal Controller in the Loop Simulation. Report no. FHWA-OR-RD-26-08. Oregon. Department of Transportation. Research Section, 2026. https://rosap.ntl.bts.gov/view/dot/89526.
Hurwitz, David, et al. Signal Controller in the Loop Simulation. Oregon. Department of Transportation. Research Section, 2026, Report no. FHWA-OR-RD-26-08, ROSA P. https://rosap.ntl.bts.gov/view/dot/89526.
A novel Hardware-in-the-loop Simulation tool was constructed to show how modifications to signal timings would improve coordinated corridor performance. A total of 15 unique microsimulation models were developed and run three times each to test three case studies of bi-direction bandwidth optimization, cycle length sensitivity, and leading pedestrian interval sensitivity. Results show that optimization can improve overall corridor operation, and that all approaches and turning movements must be evaluated. Specific improvements can be targeted using shorter cycle lengths, but cycle length reaches a point where diminishing returns are experienced. Leading Pedestrian Intervals can provide safety improvements for pedestrians, but the effects are influenced by the optimization strategies.
Hurwitz, D., Jashami, H., Scott-Deeter, L., Ul Husnain, S. B., & Li, X. (2026). Signal Controller in the Loop Simulation (Report No. FHWA-OR-RD-26-08). Oregon. Department of Transportation. Research Section. https://rosap.ntl.bts.gov/view/dot/89526
Hurwitz, David, Hisham Jashami, Logan Scott-Deeter, Syed Baqir Ul Husnain, and Xiugang Li. Signal Controller in the Loop Simulation. Report no. FHWA-OR-RD-26-08. Oregon. Department of Transportation. Research Section, 2026. https://rosap.ntl.bts.gov/view/dot/89526.
Hurwitz, David, et al. Signal Controller in the Loop Simulation. Oregon. Department of Transportation. Research Section, 2026, Report no. FHWA-OR-RD-26-08, ROSA P. https://rosap.ntl.bts.gov/view/dot/89526.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.