Windpower Demonstration Project
-
1984-06-01
Details
-
Alternative Title:Wind Power Demonstration Project
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report
-
Corporate Publisher:
-
Abstract:A wind power demonstration program was carried out to assess the potential of wind power energy for highway uses in Oklahoma. A secondary purpose of the program was to provide information for the public on the use of wind power for more general applications. Winds peed measuring equipment was installed at the Erick Information Center along I-40 in Western Oklahoma and at the Oklahoma DOT Maintenance Yard at Hydro, west of Oklahoma City, A wind power generator with a nomina1 rating of 25 kw was installed on a 60-ft tower at the Erick site. From a reliability standpoint, the wind power generator performed satisfactorily. Its availability for the one-year test period was 94%. Its annual energy output, however, was less than expected, primarily due to the lower than expected wind speed at the Erick site. The measured windspeed was approximately 25% 1ower than predicted on the basis of long-term recorded data from the Department of Commerce. Further testing and analysis will be required to determine whether the low average windspeeds represent an anomaly or a long-term trend that differs significantly from earlier Department of Commerce data.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:bc0c95e5c197fd08391c28524bcf98628353e4dc1136330b68ae7b6c5b6fc23ffc73bcd3b9a876b94e8ecdf7d99e9307ab6afba6a94b4d1f6459a9e5cd4f5611
-
Download URL:
-
File Type: