A Methodology for Optimizing Opening of PCC Pavements to Traffic
-
2003-08-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:Due to difficulties associated with the maintenance of highways constructed in urban settings, the expedited construction of durable portland cement concrete (PCC) pavement has become a necessity. To obtain a durable PCC pavement, a number of parameters should be considered. One important parameter is the adequate curing of a proper mix before opening the road. Since most urban roads experience excessive traffic, the tendency of highway agencies is to open a newly constructed highway to traffic as soon as possible. A rational method to assess the minimum time required to gain a desired strength before opening it to traffic is proposed here. Two reliable and easy-to-use test methods, maturity method and seismic method, are combined to improve the determination of the readiness of a road to be opened to traffic.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:0e31a5a98d6b65d28a46d98c586d19afe3a6ec42fa75eb544f2edc4f325a9f681321e0fddc4cd1ff8e3b55a2906d84c32e6030602f1401dd155dc74d58ce871e
-
Download URL:
-
File Type: