U.S. 75 North Central Expressway Reconstruction: Northwest Highway Screen Line Automobile and Transit User Panels, November 1990 Survey Results
-
1991-05-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Interim Report (September 1990-May 1991)
-
Corporate Publisher:
-
Abstract:The results of the first during-construction survey indicate that, to date, construction has had very minor Impacts upon travel in the corridor. Total trips made in the corridor and on the North Central Expressway were not found to be significantly different from those reported in the pre-construction survey in May 1990. Likewise, departure times and travel times for the panelists work trips were not significantly different than before construction. Perhaps more Important, panelists do not perceive that conditions are much worse than before construction began. A small increase in the number of panelists using the Dallas North Tollway to the west of the Expressway was detected, along with a very small (but not statistically significant) Increased use of Greenville Avenue to the east The survey also indicated that transit users have experienced little change in conditions as a result of construction. Transit panelists rated transit service quality and reported trip times almost identical to those reported before construction conditions had not seriously affected transit service in the corridor.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:7311fc01b1b8d68b5d7a2ee3e1679c3795cb3485d91871a445162923dace0bf33021622ad1b118676a51a73962e6c1344785d48494878d13d76556ee82652460
-
Download URL:
-
File Type: