Kuo, N. M. (1987). The North Freeway Transitway: Evaluation of the First Year of Barrier-Separated Operation (Report No. FHWA/TX-87/28+339-9). Texas Transportation Institute. Texas A&M University. https://rosap.ntl.bts.gov/view/dot/85866
Kuo, Nana M.. The North Freeway Transitway: Evaluation of the First Year of Barrier-Separated Operation. Report no. FHWA/TX-87/28+339-9. Texas Transportation Institute. Texas A&M University, 1987. https://rosap.ntl.bts.gov/view/dot/85866.
Kuo, Nana M. The North Freeway Transitway: Evaluation of the First Year of Barrier-Separated Operation. Texas Transportation Institute. Texas A&M University, 1987, Report no. FHWA/TX-87/28+339-9, ROSA P. https://rosap.ntl.bts.gov/view/dot/85866.
This report documents the development, construction, and subsequent first year's operation of the North Freeway (I-45N) Transitway in Houston, Texas. The facility and its immediate predecessor, the North Freeway Contraflow Project, are described. A detailed discussion of the problem and unique solutions encountered during the construction and contraflow-to-transitway transition process are also described. Impacts to main lane traffic, both in the peak and in the off-peak direction, are assessed through an analysis of travel times and speeds, vehicle and passenger flow rates, and freeway accident rates. Transitway operation is assessed through an analysis of HOV demand volumes and peaking characteristics, park-and-ride volumes, travel time savings, occupancy rates, violation rates, disabled vehicle incident rates, and a variety of other performance measures. Comparisons of corridor operations during the contraflow operating period, during the construction period, and during the transitway operating period are discussed and evaluated. Finally, projected facility direct benefits and costs are provided and analyzed.
This report evaluates the operation of the Katy Freeway (1-10) Transitway in Houston, Texas for calendar year 1987. This represents an evaluation of t
...
This report presents an evaluation of the operation of the North Freeway (I- 45N) Transitway in Houston, Texas for calendar year 1987. This represents
...
This report documents the second year's operation of the 1-45 North Freeway Transitway in Houston, Texas. The second year covers the period from Decem
...
Kuo, N. M. (1987). The North Freeway Transitway: Evaluation of the First Year of Barrier-Separated Operation (Report No. FHWA/TX-87/28+339-9). Texas Transportation Institute. Texas A&M University. https://rosap.ntl.bts.gov/view/dot/85866
Kuo, Nana M.. The North Freeway Transitway: Evaluation of the First Year of Barrier-Separated Operation. Report no. FHWA/TX-87/28+339-9. Texas Transportation Institute. Texas A&M University, 1987. https://rosap.ntl.bts.gov/view/dot/85866.
Kuo, Nana M. The North Freeway Transitway: Evaluation of the First Year of Barrier-Separated Operation. Texas Transportation Institute. Texas A&M University, 1987, Report no. FHWA/TX-87/28+339-9, ROSA P. https://rosap.ntl.bts.gov/view/dot/85866.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.