Development of Guardrail to Bridge Rail Transition
-
1988-06-01
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report: Sept. 1985 - Aug. 1987
-
Corporate Publisher:
-
Abstract:This report describes the development and testing of a guard fence-to-rigid bridge rail transition. The transition consists of a tubular W-beam supported on 7-inch diameter round wood posts. It is designed to transition to a vertical wall or to the concrete safety shaped barrier. It can be used on new construction or as a retrofit for existing installations Based on a full-scale vehicular crash test program, the design was judged to be in compliance with recommended impact performance criteria as presented in NCH RP Report 230. Also described is a tentative design for approach guard fence at bridge ends near an abutting roadway. The design consists of short radius, curved guardrail supported on weakened round wood posts. Tubular W-beam and nested W-beam elements were examined, and both appear to offer acceptable performance for a design impact speed of approximately 40 mph.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:f3ffee9bd142a7f5f437f5502af07ba92f8facc294ff662a2d769d4f3f2945727a1b7b3b0eb94e50c02583cedb816f8109e0050ed11509bc9c181a3bf053ab05
-
Download URL:
-
File Type: