Natural Diversion at Temporary Work Zone Lane Closures on Urban Freeways in Texas
-
1992-11-01
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Interim Report, (September 1986 - August 1992)
-
Corporate Publisher:
-
Abstract:This report documents the results of eleven field studies at temporary work zone lane closures on urban freeways in Texas. Traffic volume and travel time data were collected at each site on days when the lane closures were implemented at each site, and compared to data collected during the same time periods on similar days without a closure present. Study results indicated a large amount of natural diversion occurred at those sites where normal freeway traffic demands far exceeded the available capacity through the work zone. Entrance ramp volumes were lower a considerable distance upstream of the beginning of the queue, and were even lower at ramps located within the actual freeway queuing. Exit ramps upstream of the queue displayed very small changes in volumes. In contrast, the first exit ramp motorists encountered after reaching the freeway queue consistently experienced significant increases in volumes. As a result of the significant diversion occurring at each site, freeway queuing and delays tended to reach a threshold soon after the lane closure was enacted. The queue and delay then remained at approximately that threshold level throughout the duration of the closure. Also discussed in this report is the application of the findings from these studies to the QUEWZ computer model for estimating queuing and road user costs at freeway lane closures.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: