Utility Installation Review (UIR) System Training Materials
-
2008-10-01
-
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:The Texas Department of Transportation (TxDOT) issues thousands of approvals every year that enable new utility installations to occupy the state right-of-way (ROW). The utility installation review process currently in place is manual, tedious, and lengthy. To address this situation, TxDOT funded the development and implementation of an Internet-based system that automates the submission, review, approval, construction inspection, and archival of notices of proposed utility installation at TxDOT. This Internet-based utility permit implementation is called the Utility Installation Review (UIR) System. This package includes a collection of materials for training users of the UIR system, including TxDOT users and utility company users. The training materials include presentations in Microsoft® PowerPoint® format, as well as presenter notes and participant handouts, both in portable document format (PDF) and printout format.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:0d9299997401aa4024e37e7a4fc0399b6ba140682524e2ed0174309e49f5df21416b5ad3dcbf42f24bb6c697a522a981880bcbd937bb3e9ef20d628e25f88913
-
Download URL:
-
File Type: