Utilization of Consultants by SDHPT
-
1987-05-01
-
Details
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final: September 1985 - May 1987
-
Corporate Publisher:
-
Abstract:This study was undertaken to analyze costs, quality, and policy of using consulting services by the SDHPT for preliminary or pre-construction engineering. The issue arises out of essentially non-technical grounds rather than any need for a fundamental assessment of SDHPT's performance and policy. Briefly, the amount of preliminary construction engineering work being contracted to consultants rose from $9.2 Million in FY 1980 to $36.97 Million in FY 1986. This was principally caused by an unprecedented increase in the department's construction program fueled by both state and federal user tax increases.
-
Format:
-
Collection(s):
-
Main Document Checksum:urn:sha-512:9e379bff4a2a55a15fd4be83a3c0b61dca3109e2720eb5319835c835fa9f0e3ecff1f2ba09c0e1e6b44fdb53081d17b00ec09cc47c9f509f610bd9a778ace323
-
Download URL:
-
File Type: