Tang, Y. H., Jeong, D. Y., Perlman, A. B., & Orringer, O. (1999). Risk/benefit assessment of delayed action concept for rail inspection (Report No. DOT-VNTSC-FRA-99-7). United States. Department of Transportation. Federal Railroad Administration. https://rosap.ntl.bts.gov/view/dot/8449
Tang, Y. H., D. Y. Jeong, A. B. Perlman, and O. Orringer. Risk/benefit assessment of delayed action concept for rail inspection. Report no. DOT-VNTSC-FRA-99-7. United States. Department of Transportation. Federal Railroad Administration, 1999. https://rosap.ntl.bts.gov/view/dot/8449.
Tang, Y. H., et al. Risk/benefit assessment of delayed action concept for rail inspection. United States. Department of Transportation. Federal Railroad Administration, 1999, Report no. DOT-VNTSC-FRA-99-7, ROSA P. https://rosap.ntl.bts.gov/view/dot/8449.
A Monte Carlo simulation of certain aspects of rail inspection is presented. The simulation is used to investigate alternative practices in railroad rail inspection programs. Results are presented to compare the present practice of immediately repairing every detected defect with an alternative practice under which repair can be delayed for defects not exceeding a specified size. The sensitivities of inspection vehicle utilization and rail failure rate to variations of inspection frequency, repair gang capacity, and traffic tonnage are presented. A risk/benefit assessment of delayed action, relative to present practice, is developed and carried out to compare the risk of rail failure due to incorrect classification of defect size with the benefit of rail failure prevention due to increased opportunity to detect large defects.
Tang, Y. H., Jeong, D. Y., Perlman, A. B., & Orringer, O. (1999). Risk/benefit assessment of delayed action concept for rail inspection (Report No. DOT-VNTSC-FRA-99-7). United States. Department of Transportation. Federal Railroad Administration. https://rosap.ntl.bts.gov/view/dot/8449
Tang, Y. H., D. Y. Jeong, A. B. Perlman, and O. Orringer. Risk/benefit assessment of delayed action concept for rail inspection. Report no. DOT-VNTSC-FRA-99-7. United States. Department of Transportation. Federal Railroad Administration, 1999. https://rosap.ntl.bts.gov/view/dot/8449.
Tang, Y. H., et al. Risk/benefit assessment of delayed action concept for rail inspection. United States. Department of Transportation. Federal Railroad Administration, 1999, Report no. DOT-VNTSC-FRA-99-7, ROSA P. https://rosap.ntl.bts.gov/view/dot/8449.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.