Kraus, E., Kuzio, J., Shukla, H., Grossman, A., Harbin, K. B., Askariyeh, M., Ramani, T., Ettelman, B., & Naranjo, J. (2025). Long-Term Statewide EV Infrastructure Plan (Report No. 0-7169-P3). Texas A&M Transportation Institute. https://rosap.ntl.bts.gov/view/dot/80628
Kraus, Edgar, Jacqueline Kuzio, Harshit Shukla, Alice Grossman, Kristopher B Harbin, Mohammad Askariyeh, Tara Ramani, Ben Ettelman, and Jenny Naranjo. Long-Term Statewide EV Infrastructure Plan. Report no. 0-7169-P3. Texas A&M Transportation Institute, 2025. https://rosap.ntl.bts.gov/view/dot/80628.
Kraus, Edgar, et al. Long-Term Statewide EV Infrastructure Plan. Texas A&M Transportation Institute, 2025, Report no. 0-7169-P3, ROSA P. https://rosap.ntl.bts.gov/view/dot/80628.
This document is Product 0-7169-P3, Long-Term Statewide EV Infrastructure Strategic Plan, which the research team developed as part of Task 6 of Texas Department of Transportation (TxDOT) Project 0-7169, Post-NEVI Electric Vehicle Infrastructure Research (Freight, Fleet, and Multifamily Housing). The purpose of the long-term strategic plan is to guide infrastructure investment across the state, with a goal of a stable and consistent electric vehicle (EV) charging network. The plan is intended to help guide future charging infrastructure funding opportunities and provide guidance to effectively and equitably distribute available funding.
Researchers conducted three stakeholder workshops to assess stakeholder needs and concerns, opportunities for stakeholder coordination, and long-term
...
Kraus, E., Kuzio, J., Shukla, H., Grossman, A., Harbin, K. B., Askariyeh, M., Ramani, T., Ettelman, B., & Naranjo, J. (2025). Long-Term Statewide EV Infrastructure Plan (Report No. 0-7169-P3). Texas A&M Transportation Institute. https://rosap.ntl.bts.gov/view/dot/80628
Kraus, Edgar, Jacqueline Kuzio, Harshit Shukla, Alice Grossman, Kristopher B Harbin, Mohammad Askariyeh, Tara Ramani, Ben Ettelman, and Jenny Naranjo. Long-Term Statewide EV Infrastructure Plan. Report no. 0-7169-P3. Texas A&M Transportation Institute, 2025. https://rosap.ntl.bts.gov/view/dot/80628.
Kraus, Edgar, et al. Long-Term Statewide EV Infrastructure Plan. Texas A&M Transportation Institute, 2025, Report no. 0-7169-P3, ROSA P. https://rosap.ntl.bts.gov/view/dot/80628.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.