Barutha, P., Maguire, M., Saldana, E., & Pozo-Lora, F. F. (2024). Accelerated Bridge Construction (ABC) Decision Tool: Final Report (Report No. SPR-FY22(009);26-1122-0113-001). Nebraska. Department of Transportation. https://rosap.ntl.bts.gov/view/dot/79384
Barutha, Phil, Marc Maguire, Elio Saldana, and Fray F Pozo-Lora. Accelerated Bridge Construction (ABC) Decision Tool: Final Report. Report no. SPR-FY22(009);26-1122-0113-001. Nebraska. Department of Transportation, 2024. https://rosap.ntl.bts.gov/view/dot/79384.
Barutha, Phil, et al. Accelerated Bridge Construction (ABC) Decision Tool: Final Report. Nebraska. Department of Transportation, 2024, Report no. SPR-FY22(009);26-1122-0113-001, ROSA P. https://rosap.ntl.bts.gov/view/dot/79384.
This report investigates the creation and assessment of a decision-making tool developed to aid the Nebraska Department of Transportation (NDOT) in determining the suitability of the Accelerated Bridge Construction (ABC) method for bridge replacement projects. The tool utilizes the Analytic Hierarchy Process (AHP) to integrate different criteria, including Average Daily Traffic (ADT), Average Daily Truck Traffic (ADTT), detour time, railroad impact, economy of scale, and the use of typical details, which were found to be paramount in the decision-making process across the state. A sensitivity analysis was conducted to evaluate the tool’s performance and identify the most significant factors influencing the implementation of ABC for average Nebraska bridges. After testing the tool on a dataset of 123 local bridges needing replacement, it identified 10 confirmed candidates for ABC, 38 requiring further evaluation, and 75 more suitable for traditional construction methods. Additionally, the developed tool was compared with two existing decision-making tools from other states, showing similar results in 80% of the bridge replacement cases.
Barutha, P., Maguire, M., Saldana, E., & Pozo-Lora, F. F. (2024). Accelerated Bridge Construction (ABC) Decision Tool: Final Report (Report No. SPR-FY22(009);26-1122-0113-001). Nebraska. Department of Transportation. https://rosap.ntl.bts.gov/view/dot/79384
Barutha, Phil, Marc Maguire, Elio Saldana, and Fray F Pozo-Lora. Accelerated Bridge Construction (ABC) Decision Tool: Final Report. Report no. SPR-FY22(009);26-1122-0113-001. Nebraska. Department of Transportation, 2024. https://rosap.ntl.bts.gov/view/dot/79384.
Barutha, Phil, et al. Accelerated Bridge Construction (ABC) Decision Tool: Final Report. Nebraska. Department of Transportation, 2024, Report no. SPR-FY22(009);26-1122-0113-001, ROSA P. https://rosap.ntl.bts.gov/view/dot/79384.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.