Traffic Signal Change and Clearance Interval Pooled Fund Study: Synthesis Report
-
2023-03-01
-
Details:
-
Creators:
-
Corporate Creators:
-
Contributors:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:Traffic signal controllers use yellow change and red clearance intervals at signalized intersections to alert drivers to impending changes in the right-of-way assignment between conflicting traffic movements. Determining appropriate change and clearance intervals (CCIs) is important at signalized intersections to ensure safe transfer of the right-of-way while minimizing lost time and therefore reducing intersection delay. To improve documentation and consistent implementation of CCI calculation methods in State and local agencies, the Federal Highway Administration is leading the Traffic Signal Change and Clearance Interval Pooled Fund Study. The pooled fund study sponsored a phase I study to develop a synthesis of knowledge on CCIs. The phase I study included a literature review and an agency benchmarking plan to synthesize existing research and agency practices and identify research gaps. Based on the review findings, this synthesis report presents eight research studies and the data needs to execute the research. The eight research studies include proposed methods for determining the CCIs and the CCI performance assessment.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: