Shear Friction Capacity of Corrugated Pipe Connection in Precast Footings [Summary]
-
2023-10-01
Details:
-
Creators:
-
Corporate Creators:
-
Subject/TRT Terms:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Research Brief
-
Corporate Publisher:
-
Abstract:Although new construction or replacement of bridges is many times in the best interest of the traveling public, high construction costs and potentially lengthy project delivery dates are hard to avoid. Using prefabricated bridge elements and systems (PBES) allows for reduced construction times and quicker turnaround times using Accelerated Bridge Construction (ABC). This project aimed to look at a connection type that would potentially streamline this process even further.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: