Soil Stabilization for Low-Volume Roads, Volume II: Road Engineer's Guide
-
1986-05-01
Details:
-
Creators:
-
Corporate Creators:
-
Contributors:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:Volumes 1 and 3 of this report are guide booklets for administrators and road builders respectively. Volume 4 of this report documents the use and cost-benefits of four stabilization treatments, i.e., lime, asphalt, cement, and lime-fly ash in the construction of low-volume roads. Volume 2, contained herein, is a guide booklet for the road engineers to provide assistance in evaluating and designing stabilized soil pavements for low-volume roads. The information about specific factors such as traffic, soil, climate, stabilizer selection, unique design procedures, construction equipment and quality control is presented. The procedures for the evaluation and selection of a compatible stabilizer, the stabilizer's application rate and specific construction requirements are outlined. The five major construction steps: soil preparation, stabilizer application, pulverization and mixing, compaction, and curing are detailed.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: