Testing of New Bridge Rail and Transition Designs, Volume III: Appendix B, BR27D Bridge Railing
-
1997-07-01
Details:
-
Creators:
-
Corporate Creators:
-
Contributors:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Corporate Publisher:
-
Abstract:A combination concrete parapet and metal railing for performance level one of the 1989 AASHTO Guide Specifications for Bridge Railings was designed and tested while mounted both on a sidewalk and flush on the deck. The upper portion of the railing permits some visibility through the railing while the 42-in. (1.07-m) height is provided for pedestrians. Acceptable performance was demonstrated in the tests.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: