Qin, X., Gottlieb, M., Solverson, S., & Amer, M. W. (2022). Design-Build Pilot Program Evaluation (Report No. WisDOT ID no. 0092-22-68). Wisconsin. Department of Transportation. https://rosap.ntl.bts.gov/view/dot/67833
Qin, Xiao, Mark Gottlieb, Scott Solverson, and Mohammad Wael Amer. Design-Build Pilot Program Evaluation. Report no. WisDOT ID no. 0092-22-68. Wisconsin. Department of Transportation, 2022. https://rosap.ntl.bts.gov/view/dot/67833.
Qin, Xiao, et al. Design-Build Pilot Program Evaluation. Wisconsin. Department of Transportation, 2022, Report no. WisDOT ID no. 0092-22-68, ROSA P. https://rosap.ntl.bts.gov/view/dot/67833.
The purpose of this project was to evaluate the Wisconsin Department of Transportation (WisDOT) pilot program for design-build project delivery. Under legislation adopted in 2019, WisDOT was authorized to award up to six highway or bridge projects under one of three delivery methods: low-bid design build, best-value design build, or fixed-price design build. The University of Wisconsin-Milwaukee Institute for Physical Infrastructure and Transportation (IPIT) research team interviewed alternative delivery program management staff from four peer states (Arkansas, Colorado, Maryland and Michigan). The pilot program presents several opportunities for WisDOT and its stakeholders. It allows WisDOT to develop and refine its policies and processes on a limited number of projects. Stakeholder outreach is particularly important when implementing an alternative delivery program.
Historically, apart from a very limited number of specifically authorized exceptions, WisDOT has been required to utilize the design-bid-build method
...
Qin, X., Gottlieb, M., Solverson, S., & Amer, M. W. (2022). Design-Build Pilot Program Evaluation (Report No. WisDOT ID no. 0092-22-68). Wisconsin. Department of Transportation. https://rosap.ntl.bts.gov/view/dot/67833
Qin, Xiao, Mark Gottlieb, Scott Solverson, and Mohammad Wael Amer. Design-Build Pilot Program Evaluation. Report no. WisDOT ID no. 0092-22-68. Wisconsin. Department of Transportation, 2022. https://rosap.ntl.bts.gov/view/dot/67833.
Qin, Xiao, et al. Design-Build Pilot Program Evaluation. Wisconsin. Department of Transportation, 2022, Report no. WisDOT ID no. 0092-22-68, ROSA P. https://rosap.ntl.bts.gov/view/dot/67833.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.