Long-Term Pavement Performance Warm-Mix Asphalt Study Final Report, Volume Ⅳ: SPS-10 Materials Sampling and Testing Requirements
-
2023-02-01
-
Details:
-
Creators:
-
Corporate Creators:
-
Contributors:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:Guidelines for the development and implementation of a material-sampling and testing program for each test site included in the Specific Pavement Studies-10 (SPS-10) warm-mix asphalt study are presented in this report. These guidelines should be followed by a Federal Highway Administration Long-Term Pavement Performance (LTPP) regional support contractor to develop a material-sampling and testing plan tailored to each SPS-10 project. Field materials sampling and testing should be performed with the guidelines presented in this report and those contained in the SHRP-LTPP Guide for Field Material Sampling, Testing, and Handling. All laboratory testing should conform to the guidelines contained in the Long-Term Pavement Performance Project Laboratory Materials Testing and Handling Guide.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: