Brown, H., Sun, C., Edara, P., & Rahmani, R. (2018). Extension of Safety Assessment Tool for Construction Work Zone Phasing Plans (Report No. Part of InTrans Project 18-535). Smart Work Zone Deployment Initiative. https://rosap.ntl.bts.gov/view/dot/66529
Brown, Henry, Carlos Sun, Praveen Edara, and Roozbeh Rahmani. Extension of Safety Assessment Tool for Construction Work Zone Phasing Plans. Report no. Part of InTrans Project 18-535. Smart Work Zone Deployment Initiative, 2018. https://rosap.ntl.bts.gov/view/dot/66529.
Brown, Henry, et al. Extension of Safety Assessment Tool for Construction Work Zone Phasing Plans. Smart Work Zone Deployment Initiative, 2018, Report no. Part of InTrans Project 18-535, ROSA P. https://rosap.ntl.bts.gov/view/dot/66529.
Engineering practitioners must balance safety and mobility when evaluating different construction phasing alternatives for highway work zones. There is a need for practitioner guidance and practical tools to assess work zone safety impacts as such resources are currently lacking. The objective of the study was to extend a structured safety assessment tool that was previously developed for freeways, expressways, and rural two-lane highways to include other facilities such as arterials, signalized intersections, unsignalized intersections, multi-lane highways, and ramps. Using Missouri data, this study introduces five new crash prediction models for work zones on urban multi-lane highways, arterials, ramps, signalized intersections, and unsignalized intersections. All the work zone models in this report are proposed for the first time. These work zone models are implemented in a user-friendly spreadsheet tool that automatically selects the appropriate model based on user input. The tool predicts crashes by severity, and computes the crash costs for each construction phasing alternative.
Brown, H., Sun, C., Edara, P., & Rahmani, R. (2018). Extension of Safety Assessment Tool for Construction Work Zone Phasing Plans (Report No. Part of InTrans Project 18-535). Smart Work Zone Deployment Initiative. https://rosap.ntl.bts.gov/view/dot/66529
Brown, Henry, Carlos Sun, Praveen Edara, and Roozbeh Rahmani. Extension of Safety Assessment Tool for Construction Work Zone Phasing Plans. Report no. Part of InTrans Project 18-535. Smart Work Zone Deployment Initiative, 2018. https://rosap.ntl.bts.gov/view/dot/66529.
Brown, Henry, et al. Extension of Safety Assessment Tool for Construction Work Zone Phasing Plans. Smart Work Zone Deployment Initiative, 2018, Report no. Part of InTrans Project 18-535, ROSA P. https://rosap.ntl.bts.gov/view/dot/66529.
ROSA P serves as an archival repository of USDOT-published products including scientific
findings, journal articles, guidelines, recommendations, or other information authored or co-authored by
USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to
ensure public access to scientific information.
Links with this icon indicate that you are leaving a Bureau of Transportation
Statistics (BTS)/National Transportation Library (NTL)
Web-based service.
Thank you for visiting.
You are about to access a non-government link outside of
the U.S. Department of Transportation's National
Transportation Library.
Please note: While links to Web sites outside of DOT are
offered for your convenience, when you exit DOT Web sites,
Federal privacy policy and Section 508 of the Rehabilitation
Act (accessibility requirements) no longer apply. In
addition, DOT does not attest to the accuracy, relevance,
timeliness or completeness of information provided by linked
sites. Linking to a Web site does not constitute an
endorsement by DOT of the sponsors of the site or the
products presented on the site. For more information, please
view DOT's Web site linking policy.
To get back to the page you were previously viewing, click
your Cancel button.