Traffic Optimization for Signalized Corridors (TOSCo) Phase 2 Infrastructure System Requirements and Architecture Specification Final Report
-
2022-06-30
-
Details:
-
Creators:
-
Corporate Creators:
-
Corporate Contributors:
-
Subject/TRT Terms:
-
Publication/ Report Number:
-
Resource Type:
-
Geographical Coverage:
-
Edition:Final Report
-
Contracting Officer:
-
Corporate Publisher:
-
Abstract:This document is an update and refinement of the system architecture and specifications for the infrastructure components of the Traffic Optimization for Signaled Corridors (TOSCo) system. This document reflects the system architecture and functionality in the controlled environment testing at the Texas A&M University System’s RELLIS campus deployed in Phase 2 of the project. The TOSCo infrastructure subsystem consists of five functional components: MAP message generation, Queue Estimation, Green Window Prediction, Signal Phase and Timing (SPaT) message generation, and differential correction message generation. This document also describes the processes and procedures used to verify the infrastructure subsystem components.
-
Format:
-
Funding:
-
Collection(s):
-
Main Document Checksum:
-
Download URL:
-
File Type: