U.S. flag An official website of the United States government.
Official websites use .gov

A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS

A lock ( ) or https:// means you've safely connected to the .gov website. Share sensitive information only on official, secure websites.

i

Synthesis of Load-Deflection Characteristics of Laterally Loaded Large Diameter Drilled Shafts: Technical Report

File Language:
English


Filetype[PDF - 16.14 MB ]

Details

  • Creators:
  • Corporate Creators:
  • Corporate Contributors:
  • Subject/TRT Terms:
  • Publication/ Report Number:
  • Resource Type:
  • Geographical Coverage:
  • Edition:
    September 2017–August 2018
  • Corporate Publisher:
  • Abstract:
    This project evaluated how well current P-y curves predict the behavior of large diameter piles subjected to monotonic lateral loading. Current P-y curves were developed about 60 years ago based on lateral load tests on piles, which were about 2 ft in diameter, while today’s pile diameters can reach 12 ft. This significant difference in scale brings into question the application of these early P-y curves to today’s large diameter piles (≥5 ft). A database of 35 piles with diameters larger than 5 ft (up to 9.8 ft) and 54 piles with diameters less than 5 ft both in sand and in clay was assembled. Predictions of load and displacement are carried out using P-y curves and LPILE. These predictions are compared to the measured loads and displacements. In sand, the ratio of predicted load over measured load Lpred/Lmeas averages 0.9 for all piles and increases with diameter from 0.7 for smaller diameter piles to 1.1 for larger diameter piles. Overall, Lpred/Lmeas is between 0.4 and 1.4 most of the time. In clay, Lpred/Lmeas averages 0.9 for all piles and decreases with diameter from 1.3 for smaller diameter piles to 0.7 for larger diameter piles. Overall, Lpred/Lmeas is between 0.4 and 1.6 most of the time. In sand, the ratio of predicted deflection over measured deflection ypred/ymeas averages 1.9 for all piles and decreases with diameter from 2.25 for smaller diameter piles to about 1 for larger diameter piles. Overall, the ratio ypred/ymeas is between 0.5 and 5 most of the time. In clay, ypred/ymeas averages about 1.4 for all piles and increases with diameter from 0.9 for smaller diameter piles to 3 for larger diameter piles. Overall, ypred/ymeas is between 0.2 and 5 most of the time with some values reaching 8 for larger diameter piles.
  • Format:
    PDF
  • Funding:
  • Collection(s):
  • Main Document Checksum:
    urn:sha256:46d0a0b3e8e78042b251d548884735f8397106748592ab99ea9cd094a09601a1
  • Download URL:
  • File Type:
    Filetype[PDF - 16.14 MB ]
File Language:
English
ON THIS PAGE
 Found an issue?
Send us an email at:
ROSA P serves as an archival repository of USDOT-published products including scientific findings, journal articles, guidelines, recommendations, or other information authored or co-authored by USDOT or funded partners. As a repository, ROSA P retains documents in their original published format to ensure public access to scientific information.